What should be done during the relocation of concrete mixing plants?
Due to various reasons, the concrete mixing station will encounter the problems of relocation and demolition. The demolition of the concrete mixing station is a very cumbersome removal work, because during the relocation process, we not only ensure that the equipment is not damaged, but can still be used normally after the relocation. In addition, we must ensure that the test machine can be installed smoothly after the demolition. Xinyun Heavy Industry learns lessons based on years of experience in demolition and relocation, summing up the precautions, and hopes to help everyone.
1,Delete the previous test:
Demolition of the batching plant, we will send personnel to the site to use the equipment and check the operation of the concrete mixing plant system to avoid accidental injury during the demolition process, and the various components in the relocation process protect the availability of relocation conditions.
2, the concrete mixing station before the removal of maintenance:
In order to ensure the normal operation of the equipment, we remove the equipment before cleaning and oiling the overall maintenance to ensure that the lubrication of the machinery in place for this move, generally need to check the main other website: the concrete mixing station host powder the discharge door, run Shaft lubrication, the main unit discharges the shaking material, the powder discharge port warehouse, measures the discharge of the discharge port, the discharge valve, the batching machine unloads the inlet, with or without the door, the powder silo and the screw are withdrawn, and the other parts of the appearance of the batching plant.
3, concrete mixing station electrical control system, gas path demolition:
The heart of the electronic control station, or the professional staff in the demolition mixing station is more familiar with the electrical system, the electrical system is divided into electric and control lines, including the strong electric motor cable, the control circuit solenoid valve, the limit sensor line, the control line, It is the control line of the control system. The powerful cabinet and console are connected to the embrace of the circuit. Unless there is a planned, step-by-step procedure, the sensor should be prepared for reasonable protection and, if necessary, deleted and saved.
a.Bag: The content includes
Disassembly, transportation, lifting, cleaning, maintenance, painting, packaging, commissioning and production;
The contract price includes labor, crane, transportation and auxiliary materials;
It does not include overhaul costs, replacement materials costs, replacement parts costs, concrete foundation costs, and lost time costs due to Party A’s reasons.
b. Clearing package: The content includes
Disassembly, transportation, lifting, cleaning, maintenance, painting, packaging, commissioning and production.
The contract price is only labor, and the rest of the costs are borne by Party A.